building Man Cave One in Scottsdale AZ

Discussion in 'The Garage' started by walkingbear, May 5, 2012.

  1. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..

    There are companies that will sell the barn door sliding slides. I used rustica hardware. They were pretty easy to work with.
    They will also sell you the metal rack .. but I had mine made by a welder.
    3 inch stock x 3/8 inch. You can measure the room and can make one long piece rather than two pieces that you will have to put together.

    I think it looks better as one and it really works well. The doors I found on CL. They came out of an office building . Heavy / fire rated doors. Good luck
  2. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    Not a grand opening but just serving coffee ,donuts and bagels to those who want to come by.

    9851 E Casitas del Rio
    Scottsdale AZ 85255.

    Give me an idea if you are coming over.
    First pour at 7AM- last cup poured 11AM
  3. Texas T

    Texas T Adventurer

    Joined:
    Jun 24, 2011
    Oddometer:
    29
    Location:
    Sun Lakes & Show Low, Arizona
    Dang! I'll be in L.A. for the RTE at Pink's Hot Dogs on Saturday. Sure would have liked to be there.
  4. advNZer?

    advNZer? Long timer

    Joined:
    Dec 31, 2008
    Oddometer:
    3,617
    Location:
    Wellington,New Zealand
    bit far for me sorry,its about 7 000 miles
  5. nchristi

    nchristi n00b

    Joined:
    Jul 25, 2012
    Oddometer:
    1
    Location:
    Phoenix, AZ
    what is the date for your 'mini' grand opening? If I am in area, will swing by.
  6. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    Saturday, November 17
  7. AZ-J

    AZ-J n00b

    Joined:
    Nov 29, 2008
    Oddometer:
    7
    Texas T announced this. I'm close so I'll try to make it. We are redoing the house, so I hope I can,.
  8. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    Work is still progressing. We demo 25 ft of block wall filled with gout and rebar.

    It has been a long time since I've swung a 12 lb sledge hammer around

    We filled the pit with the pieces and then had a crunch party.

    [​IMG]


    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    We a rotary hammer but we couldn't get the footer's to break up. We reserved a jack hammer for Thrus.
  9. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    nothing special.

    bagels, donuts and coffee.

    don't expect a clean garage.. just a place to hang out for a few hours.
  10. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    We are ready for the concrete pour on the driveway.

    6 guys were here most of the day leveling out the drive.
    Since we are pour a complete drive (6000 ft) we are doing
    it in two parts.

    Part one is from the street to the new garage. Like most pours
    we have to wait 2-3 weeks before it is hard enough to drive on.

    The contractor said I could drive a motorcycle on it in 3 days.

    The upper right side we deepen and increased the angle of the swell. We are hoping to
    get enough rock to line the sides. We have had a few heavy rain storms and I was out looking at
    how the water flowed toward the bottom. The middle left is where water from the upper driveway will exit.
    We are embedding drain tubes there.

    [​IMG]


    The trench in the middle of the drive is for storm drainage. 3 pieces of 3 inch schedule 40 pipe will be under the concrete. One of the pipes will house the
    low voltage wiring and landscaping lines to the other side of the driveway. You can see the swell on the bottom of the picture. The concrete slab has a
    3 degree pitch to drain rain water.

    That is a known 50 yr floor area. The garage is build 2 feet above that. We have been dragging a piece of fencing behind my ATV to make sure there
    is a deep enough swell.

    [​IMG]

    Task 2:

    My wife suggested that the yard would really open up if we take down all the wall between the new walls. You have to understand if she makes a comment like this you do it. She was right and the yard really opened up. The rear yard fence two months ago to now.

    [​IMG]



    The columns are in for the 16th deck beam. The decking will start this weekend.

    [​IMG]

    [​IMG]

    The clear space between the retaining walls and orgin. backyard wall will be closed off this weekend.

    [​IMG]

    Task 3:

    I decided to move the air compressor to the middle of the work area.
    Now the hose can easily be taken out to both lifts.
    Will take pictures of that in the morning
  11. zeeede

    zeeede Long timer

    Joined:
    Mar 6, 2012
    Oddometer:
    1,158
    Did anyone show for coffee on Saturday? If so, we request a report from those parties! :deal

    Looking good... I've been quietly following your progress all along...
  12. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    6 riders from cave creek showed up for coffee, donuts and bagel with cream cheese.

    Today, we poured the first third of the driveway (21 yards of mud), 2nd pour will be 30 yds and final will be 55 yds.


    Smoothing out the driveway

    [​IMG]

    we went with the exposed aggregate look, They sprayed sugar water on top of the concrete to un-bond the mud on top.

    [​IMG]

    drainage is working
    [​IMG]

    4-5 inches of mud ..

    [​IMG]

    [​IMG]

    [​IMG]
  13. advNZer?

    advNZer? Long timer

    Joined:
    Dec 31, 2008
    Oddometer:
    3,617
    Location:
    Wellington,New Zealand
    must be hard work,be a pretty stiff mix i would imagine to stop too much slump(so it wont run downhill too much) hard to move around.Whats the daytime temps at this time of year?
  14. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    temp about 80 this time of year. Ideal outside temps to work in.
  15. montanaman

    montanaman Traveler

    Joined:
    Oct 30, 2003
    Oddometer:
    171
    Location:
    CA,AZ,MT..USA
    I just retired to my home in Anthem AZ ( I-17 and Cave Creek) and I would love to see this work of art in person.! What may I ask is going to occupy the 'cave" besides yourself ?
  16. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..

    2 worktables , 2 take down tables two lifts and lots of parts ..
    6 bikes..Come on over for coffee

    602-502-6360

    2nd pour was finished today. Pictures of the inside mess. Need this weekend to move things around. The R90S is coming home on Friday.

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]
  17. smoky

    smoky Been here awhile

    Joined:
    Apr 12, 2004
    Oddometer:
    624
    Location:
    Salmon Arm BC Canada
    Wow! That's a great looking driveway, looks like they did a terrific job.:clap
  18. dirtdiver

    dirtdiver Long timer

    Joined:
    Mar 26, 2006
    Oddometer:
    2,506
    Location:
    San Diego, CA + Napoli Italy
    Gosh, that was all really well done. You must be super happy. DD
  19. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    pretty happy with the driveway ..
    We are looking on how to border the drive ( stone, back fill , pavers)
    Now we have another 60 yards to pour..

    Thanks
  20. walkingbear

    walkingbear airhead_motocave

    Joined:
    Jun 5, 2004
    Oddometer:
    5,693
    Location:
    Scottsdale AZ..
    The third pour of the front half. 16 yards total and we had more than enough concrete to do the turn out also.

    It is the best driveway I ever owned. Wish I had a skate board!

    We started with junction pour connecting to the pour last Wed.

    [​IMG]


    The forman of the concrete company was here today and said this one of the best pours he
    has seen this year. The joints were crisp and they didn't use a lot of water to smooth ( to much water will crack)
    He was impress with a 6 man crew.
    [​IMG]


    [​IMG]

    We had two extra yards when we finished the pour. We were going to pour a turn out next week but since we had a hot load to use they built
    a frame and poured .. with some to spare.
    [​IMG]


    [​IMG]


    [​IMG]


    [​IMG]


    New bike 75 R90S

    [​IMG]